Projects & Portfolios
A plan and a cost collector at once, from the investment envelope down to the work package the money lands on.
15 steps · 10 questions · 12 screens on this shelf
The screens on this shelf
Workspace
Project Plan
The work breakdown, the network, the money and the critical path — drawn, because a project is a shape before it is a table.
Open
Records
Projects
A plan and a cost collector at once. The join between them is the work breakdown structure — a WBS element is simultaneously a piece of work and an account assignment.
Open
Records
Work Breakdown
Both a piece of work and an account assignment. A summary element plans and does not accept postings; a work package accepts them and is where the money actually lands.
Open
Records
Network Activities
The scheduled work below the WBS. Float is the point: an activity with zero float is on the critical path, and a day lost on it is a day lost on the project.
Open
Records
Activity Dependencies
What cannot start before what. A cycle in the network makes both scheduling passes non-terminating, so it is detected and named rather than survived.
Open
Records
Milestones
A billing milestone is what turns delivery into an invoice — the join between the plan and the cash.
Open
Records
Project Budgets
Versioned, because "what was the original budget" and "what is the budget now" are both asked and one mutable number answers neither.
Open
View
Project Costs
Planned, committed, actual and billed in one table, because the four have to be compared and comparing four tables is how a project report disagrees with itself.
Open
Records
Project Resources
Who is booked to what, and for how much of their week. A named person, or a requirement not yet filled — both are real and the second is what a resource manager works from.
Open
Records
Risks & Issues
The exposure in money, so a risk register can be added up and compared with the contingency held.
Open
Records
Project Programs
A program exists to deliver a BENEFIT, and a program whose benefit is not a measurable number is a group of projects with a shared letterhead.
Open
Records
Portfolios
The envelope. A portfolio whose approved projects exceed its budget is the situation portfolio management exists to prevent, and it is invisible unless the envelope is a number.
Open