TRANXACT.AI Training

Projects & Portfolios

A plan and a cost collector at once, from the investment envelope down to the work package the money lands on.

15 steps · 10 questions · 12 screens on this shelf

The screens on this shelf

Workspace Project Plan The work breakdown, the network, the money and the critical path — drawn, because a project is a shape before it is a table. 11 stepsOpen Records Projects A plan and a cost collector at once. The join between them is the work breakdown structure — a WBS element is simultaneously a piece of work and an account assignment. 16 stepsOpen Records Work Breakdown Both a piece of work and an account assignment. A summary element plans and does not accept postings; a work package accepts them and is where the money actually lands. 16 stepsOpen Records Network Activities The scheduled work below the WBS. Float is the point: an activity with zero float is on the critical path, and a day lost on it is a day lost on the project. 12 stepsOpen Records Activity Dependencies What cannot start before what. A cycle in the network makes both scheduling passes non-terminating, so it is detected and named rather than survived. 13 stepsOpen Records Milestones A billing milestone is what turns delivery into an invoice — the join between the plan and the cash. 14 stepsOpen Records Project Budgets Versioned, because "what was the original budget" and "what is the budget now" are both asked and one mutable number answers neither. 15 stepsOpen View Project Costs Planned, committed, actual and billed in one table, because the four have to be compared and comparing four tables is how a project report disagrees with itself. 15 stepsOpen Records Project Resources Who is booked to what, and for how much of their week. A named person, or a requirement not yet filled — both are real and the second is what a resource manager works from. 12 stepsOpen Records Risks & Issues The exposure in money, so a risk register can be added up and compared with the contingency held. 15 stepsOpen Records Project Programs A program exists to deliver a BENEFIT, and a program whose benefit is not a measurable number is a group of projects with a shared letterhead. 14 stepsOpen Records Portfolios The envelope. A portfolio whose approved projects exceed its budget is the situation portfolio management exists to prevent, and it is invisible unless the envelope is a number. 16 stepsOpen

Progress is kept in this browser only — it is not sent anywhere and nobody else can see it.

← Back to Accounting