TRANXACT.AI 훈련

Job orders, clubbed MRP and the standard warehouse and shop-floor forms

A production order prints a Job Order with its components, operations with barcodes, drawing and configuration annexure; MRP makes one production order for sales-order lines built to the same answers; and every Supply Chain and Manufacturing document prints on a standard form with Code 128, QR and RFID that a Printed Forms Designer can own.

The shop floor and the warehouse scan; they should not have to type. How to reuse: values in angle brackets are examples; put your own in their place.

현실적인 · 12 분 · 7 단계 · 4 질문

걸어갔다 저널 (회계) — 1797개의 모든 화면에서 동작 방식은 동일합니다.

다음 트랙

진행 상황은 이 브라우저에만 저장되며, 다른 곳으로 전송되지 않으므로 다른 사람은 볼 수 없습니다.

← 모든 트랙