Report
Dispatch List
What is in front of each work center, in the order it should be run. Work that cannot start yet is shown and marked rather than hidden — a list that quietly drops rows is one operators stop trusting.
Open
Workspace
Station Terminal
One machine, one operator, one screen: the job in front of it, the buttons to report what was made, and the one to say why it stopped.
Open
View
Confirmations
What was made at each operation, by whom and on what. Good, scrap and rework are three quantities with three costs, and setup time is separated from run time.
Open
Records
Downtime
Every stop, coded. An open row is the machine being down right now, which is what the andon board reads.
Open
Records
Rework Orders
Rework is a document, not a footnote. Absorbed into the original order it is invisible, which is why plants believe their yield is better than it is.
Open
Records
Material Staging
The request to have material at the line before it is needed. A request rather than a movement: the movement is a warehouse task, and this is the manufacturing half of that conversation.
Open
Records
Production Shifts
The buckets OEE, downtime and confirmations are summed into. Deliberately thin — HRMS owns rosters and who is actually on shift.
Open
Records
Reason Codes
One list for stoppages, scrap and rework, because the analysis is the same analysis. The loss bucket is what lets an OEE figure be decomposed without tagging anything twice.
Open