Shop Floor
The work in front of each machine, what was made, and every minute it did not run.
11 steps · 10 questions · 8 screens on this shelf
The screens on this shelf
- Dispatch List What is in front of each work center, in the order it should be run. Work that cannot start yet is shown and m
- Station Terminal One machine, one operator, one screen: the job in front of it, the buttons to report what was made, and the on
- Confirmations What was made at each operation, by whom and on what. Good, scrap and rework are three quantities with three c
- Downtime Every stop, coded. An open row is the machine being down right now, which is what the andon board reads.
- Rework Orders Rework is a document, not a footnote. Absorbed into the original order it is invisible, which is why plants be
- Material Staging The request to have material at the line before it is needed. A request rather than a movement: the movement i
- Shifts The buckets OEE, downtime and confirmations are summed into. Deliberately thin — HRMS owns rosters and who is
- Reason Codes One list for stoppages, scrap and rework, because the analysis is the same analysis. The loss bucket is what l
Progress is kept in this browser only — it is not sent anywhere and nobody else can see it.