Kanban
Pull replenishment: a fixed number of containers, and the board that makes them visible.
13 steps · 10 questions · 5 screens on this shelf
The screens on this shelf
- Kanban Board Loops down the side, card states across. The only screen in the module with no table on it, deliberately: a ka
- Kanban Loops The control cycle: what circulates between where and where, in containers of what size, and how many of them e
- Kanban Cards The containers. Their states, summed, ARE the work in progress — there is no other number.
- Loop Sizings What the arithmetic said the card count should be, against what it is — with the inputs kept, because "why do
- Card Movements Every state change, timestamped. The loop’s real cycle time is measured off these, which is what makes the siz
Progress is kept in this browser only — it is not sent anywhere and nobody else can see it.